During the same period that the tile and masonry are being installed on your swimming pool, the electrical and gas crews will be making their important contribution, digging trenches in which to lay pipes and conduit. The masonry, gas and electrical portions of the pool will take approximately seven to 12 days to complete.


This is the time for another inspection from those troopers down at the building departments. Both the gas line and electric run must be inspected and signed off, before we can go any further in the project.

 

Now is the time to have the decking contractor install the decking around your Royal pool. We will refer you to the very best. In particular, we have a long-standing relationship with BOB FISCALINI of Fiscalini & Son Construction. Bob is always up at the crack of dawn and personally throws himself into the project at hand. We recommend Bob highly because of his many years of experience working with concrete and concrete finishing. His work is of the very best craftsmanship anywhere, and his dedication to quality and integrity is incomparable.

return to top | next page

1 2 3 4 5 6 7 8 9 10 11 12 13

home | pools and spas | online showroom | why buy a royal pool | contact us