Within the next two to four days, the steel reinforcing and the underground plumbing will be installed.
The plumbers and steel crews are experienced, having been around the pool industry for a long, long time. The relationship we have with them has lasted over 20 years, and they are well aware of Royal Pools' Standard for Quality. Everyone puts steel in the pool to support the gunite structure, but not everyone puts as much steel in the pool as Royal.
Check out the two skimmers and the 2 1/2" suction line running back to the equipment pad location. Your pool will circulate well and clean faster.
Next, the pool will be inspected. Pictures are now taken of the steel and plumbing and kept on file. These photographs are permanent records for future reference.
Then the city or county inspectors come out to the job site to fulfill their duty as watchdogs for the public. These inspections sometimes take a few days, but they are necessary and important to ensure that the contractor is building according to the submitted engineering specifications, which are on file in the building department. It is also important to check and ensure that city, county, and in some cases national, building codes are being followed. |